Project Description
- Work included the removal of an existing bathhouse and bar and the construction of a new structure set above flood levels with lockers, changing rooms, full kitchen, dining room and bar, and an exterior snack bar.
- Access was very limited due to close proximity to seawall and other existing facilities. Removal and re-construction of two tennis courts was required for access. Protection and safe separation of pool area, remaining tennis courts, and clubhouse created a challenge along with the accelerated schedule, high tides, and winter weather.